
![]()
Morgan Corp. Utility crews install all types of storm drainage, sanitary sewer, landfill leachate collection and water distribution systems. The proper installation of these “wet” utilities requires unending attention to detail and a keen eye for safety.
We have expanded our services to include the installation of fusion-welded HDPE (high density polyethylene) pipe, which is commonly used in landfill leachate collection systems, storm drainage, sanitary sewer rehabilitation work and other specialized applications. Morgan Corp.’s underground utilities projects range in size from 1,000 LF to 100,000 LF.
By utilizing the latest in modern technology and equipment and the proper procedures and techniques, we ensure that all specifications are met and that the utilities we install provide each client with a long lasting, cost-effective, and trouble-free system. Although underground utility systems are by design mostly “out of sight”, they are certainly never “out of mind” at Morgan Corp. A major component of our quality control program is the video inspection of the completed work from inside the buried pipe and structures. For this, we utilize the latest technology in remote-controlled digital video viewing and recording systems. This process ensures that materials and installations meet or exceed all applicable requirements and provides important documentation of when work was performed and that it was properly completed.
With over a dozen utility crews, Morgan Corp. has the resources to staff many projects with multiple crews. Our in-house staff of surveyors, drilling and blasting professionals, and equipment mechanics provides our utility crews with the support services necessary to complete their work safely and productively, without the delays often caused when these services are provided by outside consultants, dealers, or subcontractors.